Testing Procedures

testing

Testing Procedures

BLOG

 

SAT Tests
At Site Acceptance Tests, individualized field tests are performed to test the effectiveness of your system.

Fat Tests
In Factory Acceptance Tests, the machines are checked at the factory to check the operation and verify the parameters of the equipment.

Load Bank Testing
It is performed with a portable test load to verify under load the overall reliability of the system in case of emergency.

Current Quality Measurement
The quality parameters of the power supply in your installation are measured and recorded in detail.

The instruments used are properly calibrated as defined by the quality procedures of the installed quality assurance system ISO 9001: 2015, of the company NIGICO. After completing the measurements, we submit a technical report accompanied by corresponding measurements and graphs.